Fermi, Inc. engages in the development of energy infrastructure. The company is headquartered in Amarillo, Texas and currently employs 35 full-time employees. The company went IPO on 2025-10-01. The firm is engaged in the development of electric grids that deliver highly redundant power at a gigawatt scale, required to create artificial intelligence. Situated on a 5,236-acre site in Amarillo, Texas, Project Matador is secured by the Company pursuant to the Lease on land owned by the Texas Tech University System. Project Matador is designed to accommodate up to 6.0 gigawatt (GW) of nuclear capacity via 4.0 GW of bifurcated Westinghouse Reactors and 2.0 GW of small nuclear reactor (SMRs). Its HyperRedundant site is strategically located adjacent to natural gas fields in the United States that is within a high-radiance solar corridor, well-positioned for advanced nuclear development and supportive of multiple energy pathways including near-term natural gas power development.
FRMI'ün son EPS'si beklentilerle karşılaştırıldığında nasıldı?
Fermi Inc'in en son EPS'si $-0.18 olup, $-0.01 beklentilerini vurmak.
Fermi Inc FRMI'ün son çeyrekteki geliri nasıl performans gösterdi?
Fermi Inc'in son çeyrek geliri $-0.18
Fermi Inc'in gelir tahmini nedir?
8 Wall Street analistine göre, Fermi Inc'in gelir tahmini $193.55M ile $180.64M arasında değişmektedir.
Fermi Inc'in kazanç kalite puanı nedir?
Fermi Inc'in kazanç kalite puanı B+/49.699093'dir. Puan, karlılık, büyüme, nakit üretimi ve sermaye tahsisi ile kaldıraç olmak üzere dört boyuta dayanır.
Fermi Inc kazançlarını ne zaman rapor eder?
Fermi Inc'in bir sonraki kazanç raporu 2026-06-28'te bekleniyor
Fermi Inc'in beklenen kazançları nelerdir?
Wall Street analistlerine göre Fermi Inc'in beklenen kazançları $8.42M'dir.
Fermi Inc kazanç beklentilerini aştı mı?
Fermi Inc'in son kazançları $0.0 olup, beklentileri kazanmaz.