Grid Battery Metals, Inc. engages in the acquisition, exploration, and development of mineral resources. The company is headquartered in Coquitlam, British Columbia. The company went IPO on 2013-04-18. The firm maintains a focus on exploration for high value battery metals required for the electric vehicle (EV) market. The firm acquired a 100% interest in Grid Copper Project, which consists of 17 mineral claims comprising 27,525 hectares (approximately 275 square kilometers (km2)) located in North Central British Columbia. The firm owns a 100% interest in the Texas Spring Property, which consists of mineral lode claims located in Elko County, Nevada. The target is a lithium clay deposit in volcanic tuff and tuffaceous sediments of the Humbolt Formation. The firm also has a 100% interest in 113 lithium lode and placer claims covering over 930 hectares in Clayton Valley. The firm also owns a 100% interest in Volt Canyon Lithium Property, which has over 80 placer claims covering approximately 635 hectares of alluvial sediments and clays located 122 km northeast of Tonopah, Nevada.
根据最新的财务报表(Form-10K),Grid Battery Metals Inc. 的总资产为 $0,净亏损为 $0
EVKRF 的关键财务比率是什么?
Grid Battery Metals Inc. 的流动比率是 0,净利 margin 为 0,每股销售为 $0。
Grid Battery Metals Inc. 的收入按细分市场或地理位置如何划分?
Grid Battery Metals Inc. 最大收入来源是 Leaf and Drink Related,在最近的收益报告中收入为 420,328,000,000。就地区而言, Japan 是 Grid Battery Metals Inc. 的主要市场,收入为 416,505,000,000。